So we have been done framing for several days now. Since we have finished with framing, we have had had the hvac (heating) people come in. They installed the furnaces, the vents, and the fireplace.
Then the plumbers came in and installed the bathtubs and rough plumbing.
We are currently a bit behind. We are waiting for our windows to be delivered, the electrician is coming on July 25 and then the excavator (to level out our land) and framing (to install the windows) are coming on the next Monday and Tuesday. Hopefully after we can have our 4 way inspection before we go on our cruise.
Which we are leaving on August 2nd and returning on the 13th. We are going to Miami, Grand Cayman, Honduras, Belize and Cozumel Mexico.